Transportation / Roadway / Bridge

quixote
I-10 Widening:  LA 73 to LA 30

This project entails widening I-10 from 4 lanes to 6 lanes.  One major interchange at LA 30 consists of two bridge structures spanning LA 30.  Two other locations have bridges crossing a bayou and a local road.  SKA performed detailed bridge inspections to determine the level of reconstruction needed to widen the bridges.

quixote
LA 3241: LA 36 to LA 435

Nearly 8 miles in length, this four lane divided highway is on a new alignment provideing a north south access to I-12.  Located in St. Tammany Parish, this project has two locations with concrete girder span bridges crossing Bayou Lacombe and its Tributary.This project has an estimated Construction Cost of $70,000,000.00

quixote
State Route in Many, US 171

Sabine Parish, Estimated Construction Cost of $14,000,000.00

quixote
French Branch Bridge - West Pearl River Bridge

Route I-10, St. Tammany Parish, Estimated Construction Cost of $21,500,000.00

quixote
Burbank Drive (LA 42) Segment 2 (Bluebonnet to Highland) Urban Arterial

East Baton Rouge Parish. Construction Cost $7,500,000.00.

quixote
Essen Lane Intersection Improvements (LA3064 @ Interstate 10) Design Class UA-2

East Baton Rouge Parish. Estimated Construction Cost $2,500,000.00.

quixote
US 165 (Oberlin to Oakdale) Design Class UA-2 and RA-3

Allen Parish. Construction Cost $17,000,000.00.

quixote
LA 28 (LA 121 to LA 465) Design Class RA-4

Vernon Parish. Construction Cost $20,000,000.00.

quixote
Roddy Road Improvements

Located in Ascension Parish, Roddy Road is a heavily used two-lane arterial being widened for safety and capacity. Two bridges over the New River Canal and Bayou Narcisse are being replaced with slab span structures. Construction is expected to begin late 2020.  Total estimated construction costs are estimated at $5,500,000.00.

quixote
US 167 (From LA 3225 to Bentley) Design Class RA-3

Rapides and Grant Parishes. Construction Cost $37,700,000.00.